Wir nutzen Cookies, um Ihren Besuch auf unserer Website und unseren Service zu optimieren.
Wir betrachten die weitere Nutzung unserer Website als Zustimmung zu der Verwendung von Cookies.
Weitere Informationen finden Sie hier:
Datenschutzerklärung, Impressum
PortalDerWirtschaft.de



Suchmaschinenoptimierung
mit Content-Marketing - Ihre News
PROKODA GmbH | 06.07.2020

IBM ES54G - Basic z/OS Tuning Using the Workload Manager


Kategorie:
Zeitraum:
PLZ/Ort:
Seminare, Workshops
14.05.2018 - 18.05.2018
DE-20095 Hamburg

Seminarbeschreibung:

Tuning methodology
describe the basc terms in the process of tuning and system structure

outline the tuning methodology, including the factors affecting performance and the individual steps in analyzing system performance

SMF and RMF

set up collection and utilize SMF data

implement and analyze RMF measurements for Monitors I, II, and III

utilize the RMF Spreadsheet Reporter and RMF Performance Management

CPU performance when running in a shared LPAR environment

utilize zSeries processor metrics and LPAR weights

analyze RMF CPU and LPAR reports

describe the functionality of zAAP processors

Basic system workload management

use WLM dialog to create/modify service definitions

create service class goals and classification rules to manage a complex z/OS workload

WLM commands, internals and services

understand the behavior and operation of WLM services, including enclaves, application environments, execution delay monitoring, and their use by DB2, WebSphere and CICS

optimize the use of WLM-managed initiators

Measure and tune z/OS DASD and processor storage

understand DASD configurations in order to analyze RMF DASD reports

interpret RMF paging and virtual storage reporting

Additional Topics - Coupling Facility, Intelligent Resource Director (IRD), Global Resource Serialization (GRS), Workload License Charges (WLC), and Enterprise Workload Manager (EWLM)

analyze RMF coupling facility reports through an understanding of how a CF operates in a parallel sysplex

understand the basic functionality, terminology and benefits of Intelligent Resource Director (IRD)

state how GRS operations can be tuned for optimal z/OS performance

utilize WLC, defined capacity, and the sub-capacity reporting tool to optimize software charges

describe how WLM implements soft capping

understand the operation and usage of EWLM and its relationship to z/OS WLM


Voraussetzung: You should:


Understand basic MVS and z/OS operation, such as job flow through JES, job scheduling paging, swapping, dispatching controls, and I/O scheduling

Have a basic knowledge of the purpose of the Workload Managers function in managing system workloads

Be familiar with using TSO and ISPF to manage data sets and run batch jobs


Preis: 3300,- € (zzgl. MwSt.) pro Teilnehmer.

Uhrzeit: Von 09:00 bis 16:00

Teilnehmergruppe: 3 bis 8

Dauer in Std: 40

Frühbucher: Preis: 3234 € bis zum 13.04.2018 reservieren.


Zur Veranstaltungsseite: https://www.prokoda.de/

Unternehmenseintrag: PROKODA GmbH

Eingestellt am: 06.07.2020 von: .

Weitere Events von PROKODA GmbH: